ManufacturingPlans revised
Tennessee Truck Plant
Stanton, Tennessee· Reviewed 2026-09-18
What’s happening here
Original 2025 EV schedule is historical; current site is Tennessee Truck Plant, hires ~2,300, truck production targeted for 2029
- Project owner
- Ford; SK On separately owns/operates Tennessee battery plant after JV disposition
- Known construction partner
- Not identified in reviewed current sources
- Current phase
- planned/transitioning product launch
- Construction workforce context
- ~2,300 current planned hires; original ~6,000 campus jobscurrent site hiring vs historical project estimate
Project scale is not an opening count.Workforce figures can describe peak crews, long-term employment, or operations jobs. Current positions must be confirmed through the hiring organization.
Trades relevant to the work
Stamping, body, paint, assembly, battery pack, supplier equipment, industrial electrical, millwright, HVAC, controls
These are trades associated with the project scope, not a verified list of current vacancies.
Per diem & other perks
No current, project-specific incentive package was confirmed in this research. Ask the hiring employer about per diem, lodging, travel, overtime, and attendance conditions for the exact assignment.
Explore sourced incentive examplesJobs at this project
Loading project-linked listings…
Job listings are separate from project activity. An active construction site does not establish a current opening.
Post a job for this projectWhat still needs confirming
- Active construction packages
- Field headcount
- Truck production ramp
Go straight to the sources
Ford BlueOval City current siteFord · Publication date not stated · Reviewed 2026-09-18
Ford BlueOval City FAQsFord · Publication date not stated · Reviewed 2026-09-18
BlueOval City original announcementFord · Published 2021-12-23 · Reviewed 2026-09-18
Ford reinvests in trucks, hybrids and affordable EVsFord · Published 2025-12-15 · Reviewed 2026-09-18