Stargate/Oracle-Crusoe Abilene AI datacenter

Abilene/Taylor County, Texas· Reviewed 2026-09-18

What’s happening here

AI workloads live less than a year after construction began; eight-building campus

Project owner
Oracle / Crusoe partners
Known construction partner
Not identified in reviewed primary sources
Current phase
first phase operating; campus construction/expansion
Construction workforce context
>9,000 construction; 1,000 ongoingOracle owner estimate; construction vs post-construction supported jobs
Project scale is not an opening count.Workforce figures can describe peak crews, long-term employment, or operations jobs. Current positions must be confirmed through the hiring organization.

Trades relevant to the work

Sitework, concrete/steel, electrical distribution, cooling, gas turbines, controls, fiber, commissioning

These are trades associated with the project scope, not a verified list of current vacancies.

Per diem & other perks

No current, project-specific incentive package was confirmed in this research. Ask the hiring employer about per diem, lodging, travel, overtime, and attendance conditions for the exact assignment.

Explore sourced incentive examples

Jobs at this project

Loading project-linked listings…

Job listings are separate from project activity. An active construction site does not establish a current opening.

Post a job for this project

What still needs confirming

  • Active building count
  • GC roster
  • Current field openings

Go straight to the sources

Abilene Data Center factsOracle · Publication date not stated · Reviewed 2026-09-18
Crusoe announces flagship Abilene datacenter is liveCrusoe · Published 2025-09-30 · Reviewed 2026-09-18