Energy & LNGUnder construction
Port Arthur LNG
Port Arthur, Texas· Reviewed 2026-09-18
What’s happening here
Train 1 near end-2027 operations; Train 2 in 2028; Phase 2 construction began Sep 2025
- Project owner
- Sempra Infrastructure
- Known construction partner
- Bechtel principal EPC for Phase 1 per reviewed project materials; reconfirm package-by-package
- Current phase
- active build
- Construction workforce context
- ~5,000 peak Phase 1Bechtel Phase 1 peak-site estimate; not current headcount or Phase 2 total
Project scale is not an opening count.Workforce figures can describe peak crews, long-term employment, or operations jobs. Current positions must be confirmed through the hiring organization.
Trades relevant to the work
LNG trains, tanks, civil, piping, welding, electrical/instrumentation, commissioning
These are trades associated with the project scope, not a verified list of current vacancies.
Per diem & other perks
No current, project-specific incentive package was confirmed in this research. Ask the hiring employer about per diem, lodging, travel, overtime, and attendance conditions for the exact assignment.
Explore sourced incentive examplesJobs at this project
Loading project-linked listings…
Job listings are separate from project activity. An active construction site does not establish a current opening.
Post a job for this projectWhat still needs confirming
- Current crew
- Field percentage complete
- Phase 2 direct hiring
Go straight to the sources
Sempra Annual Report 2025Sempra · Publication date not stated · Reviewed 2026-09-18
Port Arthur LNGBechtel · Publication date not stated · Reviewed 2026-09-18