What’s happening here
Broke ground in 2022; operational by Aug 2025
Operational and serving traffic; construction phase has turned over
- Project owner
- Meta
- Known construction partner
- Unknown from reviewed public sources
- Current phase
- operating / construction turnover
- Construction workforce context
- 1,500 peak skilled-trade workers; >100 operational jobsMeta's construction-peak and post-completion figures; not current vacancies.
Project scale is not an opening count.Workforce figures can describe peak crews, long-term employment, or operations jobs. Current positions must be confirmed through the hiring organization.
Trades relevant to the work
Historical peak demand for skilled trades; commissioning, electrical, mechanical, controls, and facilities maintenance inferred from the campus type.
These are trades associated with the project scope, not a verified list of current vacancies.
Per diem & other perks
No current, project-specific incentive package was confirmed in this research. Ask the hiring employer about per diem, lodging, travel, overtime, and attendance conditions for the exact assignment.
Explore sourced incentive examplesJobs at this project
Loading project-linked listings…
Job listings are separate from project activity. An active construction site does not establish a current opening.
Post a job for this projectWhat still needs confirming
- Current operations headcount and open craft positions are not published.
- GC and subcontractor roster not identified.