Frederick Douglass Tunnel
Baltimore, Maryland· Reviewed 2026-09-19
What’s happening here
Amtrak July 28, 2026 update: construction accelerated; utility tunnel targeted for 2027, new tunnel opening target 2036
Amtrak reports visible bridge, utility and enabling construction; first tunnel-boring machine launch is planned for 2028
- Project owner
- Maryland Department of Transportation and Amtrak/Federal Railroad Administration partners
- Known construction partner
- Amtrak says tunneling contractor is ramping preparatory work; Kiewit/J.F. Shea joint venture awarded major tunnel contract
- Current phase
- Active construction; tunnel-boring preparation
- Construction workforce context
- 7,000 jobs/year over seven years (historic state estimate)Federal source quotes Maryland estimate; not a current headcount
Trades relevant to the work
Inferred: tunnel boring/excavation, concrete, rebar, structural, track, signals, electrical, ventilation, bridges, roadway and station work
These are trades associated with the project scope, not a verified list of current vacancies.
Per diem & other perks
No current, project-specific incentive package was confirmed in this research. Ask the hiring employer about per diem, lodging, travel, overtime, and attendance conditions for the exact assignment.
Explore sourced incentive examplesJobs at this project
Loading project-linked listings…
Job listings are separate from project activity. An active construction site does not establish a current opening.
Post a job for this projectWhat still needs confirming
- Current package schedule
- Current craft staffing
- Prime and subcontractor hiring channels
- Completion date by segment