California High-Speed Rail Central Valley

Central Valley, California· Reviewed 2026-09-18

What’s happening here

119 miles in construction; 61 structures complete by June 2026; CP2-3 is 65 miles and CP4 22 miles

Project owner
California High-Speed Rail Authority
Known construction partner
Dragados-Flatiron JV on CP2-3; other package contractors
Current phase
active segmented build
Construction workforce context
>10,000 historicalauthority historical jobs-since-start figure, not current headcount
Project scale is not an opening count.Workforce figures can describe peak crews, long-term employment, or operations jobs. Current positions must be confirmed through the hiring organization.

Trades relevant to the work

Earthwork, concrete, rebar, bridge/viaduct, rail systems, utilities, survey, equipment, traffic control

These are trades associated with the project scope, not a verified list of current vacancies.

Per diem & other perks

No current, project-specific incentive package was confirmed in this research. Ask the hiring employer about per diem, lodging, travel, overtime, and attendance conditions for the exact assignment.

Explore sourced incentive examples

Jobs at this project

Loading project-linked listings…

Job listings are separate from project activity. An active construction site does not establish a current opening.

Post a job for this project

What still needs confirming

  • Current crew
  • Future funding
  • Package-level hiring

Go straight to the sources

California High-Speed Rail construction dashboardCalifornia High-Speed Rail Authority · Publication date not stated · Reviewed 2026-09-18
CP2-3 construction alertCalifornia High-Speed Rail Authority / Dragados-Flatiron JV · Published 2026-03-04 · Reviewed 2026-09-18