Brent Spence Bridge Corridor

Cincinnati, Ohio / Northern Kentucky· Reviewed 2026-09-18

What’s happening here

Plans finalized Mar 2026; demolition Apr 2026; groundbreaking May 8, 2026

Project owner
Ohio DOT and Kentucky Transportation Cabinet
Known construction partner
Walsh Kokosing design-build prime
Current phase
active early construction/demolition
Construction workforce context
700+ skilled trades; up to 1,000 peak; ~6m work hoursproject estimate with explicit peak language
Project scale is not an opening count.Workforce figures can describe peak crews, long-term employment, or operations jobs. Current positions must be confirmed through the hiring organization.

Trades relevant to the work

Bridge steel, concrete, excavation, paving, traffic control, utility relocation, marine, equipment operation

These are trades associated with the project scope, not a verified list of current vacancies.

Per diem & other perks

No current, project-specific incentive package was confirmed in this research. Ask the hiring employer about per diem, lodging, travel, overtime, and attendance conditions for the exact assignment.

Explore sourced incentive examples

Jobs at this project

Loading project-linked listings…

Job listings are separate from project activity. An active construction site does not establish a current opening.

Post a job for this project

What still needs confirming

  • Package openings
  • Northern corridor start dates

Go straight to the sources

Brent Spence project timelineBrent Spence Bridge Corridor · Publication date not stated · Reviewed 2026-09-18