InfrastructureUnder construction
Brent Spence Bridge Corridor
Cincinnati, Ohio / Northern Kentucky· Reviewed 2026-09-18
What’s happening here
Plans finalized Mar 2026; demolition Apr 2026; groundbreaking May 8, 2026
- Project owner
- Ohio DOT and Kentucky Transportation Cabinet
- Known construction partner
- Walsh Kokosing design-build prime
- Current phase
- active early construction/demolition
- Construction workforce context
- 700+ skilled trades; up to 1,000 peak; ~6m work hoursproject estimate with explicit peak language
Project scale is not an opening count.Workforce figures can describe peak crews, long-term employment, or operations jobs. Current positions must be confirmed through the hiring organization.
Trades relevant to the work
Bridge steel, concrete, excavation, paving, traffic control, utility relocation, marine, equipment operation
These are trades associated with the project scope, not a verified list of current vacancies.
Per diem & other perks
No current, project-specific incentive package was confirmed in this research. Ask the hiring employer about per diem, lodging, travel, overtime, and attendance conditions for the exact assignment.
Explore sourced incentive examplesJobs at this project
Loading project-linked listings…
Job listings are separate from project activity. An active construction site does not establish a current opening.
Post a job for this projectWhat still needs confirming
- Package openings
- Northern corridor start dates
Go straight to the sources
Brent Spence project timelineBrent Spence Bridge Corridor · Publication date not stated · Reviewed 2026-09-18