Baltimore Key Bridge rebuild
Baltimore, Maryland· Reviewed 2026-09-19
What’s happening here
Phase 2 contractor reset in April 2026; MDTA industry forum and procurements reported May 19, 2026
MDTA reports design/construction procurement and major construction activities projected throughout 2026
- Project owner
- Maryland Transportation Authority
- Known construction partner
- Kiewit was removed from Phase 2 in April 2026; MDTA is procuring replacement packages
- Current phase
- Pre-construction and phased construction procurement
- Construction workforce context
- Not establishedCurrent project workforce estimate not published in cited MDTA sources
Trades relevant to the work
Inferred: marine demolition, temporary works, piles, foundations, cable-stayed bridge steel, concrete, electrical, traffic systems and marine logistics
These are trades associated with the project scope, not a verified list of current vacancies.
Per diem & other perks
No current, project-specific incentive package was confirmed in this research. Ask the hiring employer about per diem, lodging, travel, overtime, and attendance conditions for the exact assignment.
Explore sourced incentive examplesJobs at this project
Loading project-linked listings…
Job listings are separate from project activity. An active construction site does not establish a current opening.
Post a job for this projectWhat still needs confirming
- Replacement Phase 2 prime award
- Current construction workforce
- Final design and cost after procurement reset
- Trade hiring channel